- 相关推荐
外贸模具英语口语交流(2)
6)、产品前后模方向你是如何考虑的?

1、这很容易决定。外观面前模出。它不会粘前模;
2、如果这边前模出,产品有30%机会粘前模。我们需预留空间用于修改模。
3、我也是这么认为的。不过,我们需做一些图片,与客户确认;
6) How do you consider the direction ofcavity & core?
1. It is easy to decide that. The visiblesurface is cavity. It will not stick on the cavity side.
2. If this side is cavity, the part has a30% chance to stick to the cavity. We need to make extra room for futurechanges / modifications.
3. I think so. But we need to make somepictures and confirm with customer.
7)、你认为会不会粘行位或斜顶?
1、模具结构挺简单的,应当不会;
2、产品扣位处可能粘行位。我们需考虑行位上加顶针;
3、产品可能粘斜顶,所以我们需要考虑粘斜顶的部分如何分型。
7) Do you foresee sticking slide or anglelifter?
1. No. The mould structure is simple.
2. The undercut area may stick slide. Wemay consider to add an ejector pin on the slide.
3. The part may stick on the angle lifter,so we need to consider the parting line for this area.
8)、这是不是按最新版本产品图设计的?
1、是啊,没错。我们是是用最新版本产品图来更新模图的;
2、我不太确定,我得检查一下,然后再告诉你,好吗?
8) Is the design accordingly to the latestversion of the part drawing?
1. Yes. We revised the mould drawingaccordingly to the latest part drawing.
2. I am not sure. I will double check this(issue) and tell you later, ok?
9)、这(塑胶料)的缩水是不是正确?
1、是正确的,我查过了它的材料物性表;
2、不太肯定。这是客户提供的。我会再查确认一下。
9) Is the shrinkage rate correct?
1. Yes, I have double checked the mouldingmaterial specification.
2. Not sure. It was provided by thecustomer. I will double check it.
10)、模具是否和啤机相匹配?TIE BAR间距是多少?
1、模具可以放得进客户要求的啤机。法兰也是匹配的;
2、我得检查一下它的唧嘴大小,顶棍孔位置以及顶杆螺牙类型是否正确。
10) Does the mould have a good fit with themoulding machine? What is the tie bar distance?
1. Yes, it is no problem to put the mouldinto the specified moulding machine. The location ring has a good fit with themachine as well.
2. I need to double check the sprue radius,the location of the KO hole, and the thread type of ejector rod.
11)、模具能否全自动运行?
1、产品和流道都可以自动掉下来;
2、产品需机械手取出;
3、产品可能会挂在斜顶上,需考虑二次顶出。
11) Does the mould run fully automatic?
1. Yes, both the part and runner fall downfully automatically.
2. No, the part need to be taken out byrobot.
3. The part may hang on the angle lifter,so we need to consider two stage ejection.
https://www.unjs.com/【外贸模具英语口语交流(2)】相关文章:
外贸交流拓展业务关系英语口语表达08-11
外贸常用的英语口语09-18
外贸常用英语口语09-18
外贸面试英语口语对话09-14
30句外贸经典英语口语07-09
同事间交流的英语口语05-27
外贸英语口语欧洲各国的外贸习惯09-08
外贸报价争议常用英语口语09-20
如何提高外贸英语口语水平08-08
外贸建立贸易关系英语口语10-14